Floors, Interior - Ceramic or Porcelain Tile
 |
19.2" (488 mm) o.c. joist spacing, single layer OSB or plywood subfloor
Areas of Application
- over any even and structurally sound OSB or plywood subfloor with 19.2" (488 mm) o.c.joist spacing
- interior dry or wet areas
Limitations
- minimum 2" x 2" (50 mm x 50 mm) tile
- not intended for natural stone; see detail D-W-S, page 6
Requirements
- maximum spacing of joists, I-joists, or floor trusses is 19.2" (488 mm) o.c.
- minimum subfloor thickness – 23/32", 3/4" nom. (19 mm) tongue-and-groove with 1/8" (3 mm) gap between sheets
Substrate Preparation
- verify that subfloor panels are properly fastened to framing members
- any leveling of the subfloor must be done prior to installing Schluter-DITRA
Movement Joints
- Schluter-DITRA does not eliminate the need for movement joints, including perimeter joints, within the tiled surface. Movement joints should be installed in accordance with industry standards and norms; see page 20 of this Handbook, TCA EJ171, and TTMAC 301 MJ.
Setting and Grouting Materials
- latex portland cement (p.c.) mortar - ANSI A118.11
- unmodified thin-set mortar - ANSI A118.1
- grout - ANSI A118.3, A118.6, A118.7, A118.8
Setting and Grouting Specifications
- tile - ANSI A108.5
- grout - ANSI A108.6, A108.9, A108.10
Other Considerations
- tightly butted and/or tented plywood or OSB seams must be addressed prior to installing Schluter-DITRA
- vapor barrier on crawl space floors according to regional building codes where a waterproof floor is required, all Schluter-DITRA seams and floor/wall transitions must be sealed with Schluter-KERDI-BAND using unmodified thin-set mortar; see page 14
*** Essential ** Significant * Helpful
|
|
|