|
|
Installation
- The load-bearing substrate and waterproofing membrane must be flat and adequately sloped toward, and connected to, the designated drainage exit.
- Irrespective of slope, Schluter-TROBA is loosely laid over the waterproofing membrane. Individual courses of Schluter-TROBA are overlapped along the flat edges while the ends of two courses are overlapped by at least one row of studs.
- The surface covering assembly is installed directly over the Schluter-TROBA according to current industry standards. If tile is to be installed using the Schluter-DITRA system, please refer to the Schluter-DITRA Installation Handbook for complete installation instructions and warranty criteria.
|
|