Schluter®-DILEX-MOP

Installation

  1. Select Schluter-DILEX-MOP height according to the height of the assembly.
  2. Set the profile flush against the edge area of an already completed field. The profile must be completely embedded laterally.
  3. Install tiles for the adjacent field flush to the profile surface. The profile must be completely embedded laterally.
  4. Fill the remaining joint between the profile and the covering completely with grout or setting material.

Installation note on joint repair:
Prepare the joint’s width and depth appropriately and insert profile into joint. Fill joint space between profile and covering completely with grout, epoxy, or thin-set mortar.