An honor and a privilege
Building an accessible shower for Staff Sergeant Brad Lang
Cove-shaped Profiles
Schluter®-DILEX-HKW
Schluter®-DILEX-HKW
Cove-shaped Profiles
Schluter®-DILEX-HKWCove-shaped Profiles
Schluter®-DILEX-PHK
Schluter®-DILEX-PHK
Cove-shaped Profiles
Schluter®-DILEX-PHKUncoupling (DITRA)
Schluter®-DITRA-HEAT-DUO
Schluter®-DITRA-HEAT-DUO
Uncoupling (DITRA)
Schluter®-DITRA-HEAT-DUOUncoupling (DITRA)
Schluter®-DITRA-HEAT-DUO-PS
Schluter®-DITRA-HEAT-DUO-PS
Uncoupling (DITRA)
Schluter®-DITRA-HEAT-DUO-PS
Schluter®-BEKOTEC
Schluter®-BEKOTEC
Schluter®-BEKOTEC-F
Schluter®-BEKOTEC-F
Schluter®-PRIMER-U
Schluter®-PRIMER-U
Schluter®-PRIMER-PS
Schluter®-PRIMER-PS
Paver Support System
Schluter TROBA-LEVEL-PLV60/-PLA70
Schluter TROBA-LEVEL-PLV60/-PLA70
Paver Support System
Schluter TROBA-LEVEL-PLV60/-PLA70Paver Support System
Schluter TROBA-LEVEL-LV3/-PL10
Schluter TROBA-LEVEL-LV3/-PL10
Paver Support System
Schluter TROBA-LEVEL-LV3/-PL10
Schluter®-TROWEL
Schluter®-TROWEL
Schluter ALL-SET®
Schluter ALL-SET®
Building an accessible shower for Staff Sergeant Brad Lang
'The load is the total amount watts from all the heating cables connected to the...
To continue the company’s commitment to industry education, Schluter has developed a series of live, online training programs that can be attended remotely.
The Vesper project in Austin, Texas, utilized Schluter® Systems' DITRA-HEAT-DUO membrane for waterproofing and sound control in 283 condominium units. Collaboration with Schluter and STG-Austin expedited the project, ensuring quality results. Tests demonstrated exceptional resilience of Schluter products, surpassing building code standards with an AIIC value of 64. This project underscores the importance of efficiency and quality in multi-family construction.
How long do I have to wait before installing tile on Schluter®-DITRA-HEAT?
Once the DITRA-HEAT membrane has been installed and the heating cables have been embedded within the membrane and tested, the tile can be installed right away...
Read moreI’m planning to install my tile using Schluter®-DITRA. Where do I begin?
The first thing to do is plan out the installation according to the Schluter-DITRA Installation Handbook...
Read moreThe under floor heating cable has a ground wire, however the thermostat has no terminal for ground. What shall I do with the ground wire?
The heating cable ground wire can be hooked up to house ground within the junction box.
Read more