Sound Control and Thermal Break
DITRA-HEAT-DUO, formerly DITRA-HEAT-TB, reduces sound transmission, in addition to warming the floor and still supporting the covering to ensure a lasting installation.
Cove-shaped Profiles
Schluter®-DILEX-HKWCove-shaped Profiles
Schluter®-DILEX-HKWCove-shaped Profiles
Schluter®-DILEX-PHKCove-shaped Profiles
Schluter®-DILEX-PHKUncoupling (DITRA)
Schluter®-DITRA-HEAT-DUOUncoupling (DITRA)
Schluter®-DITRA-HEAT-DUOUncoupling (DITRA)
Schluter®-DITRA-HEAT-DUO-PSUncoupling (DITRA)
Schluter®-DITRA-HEAT-DUO-PSPaver Support System
Schluter TROBA-LEVEL-PLV60/-PLA70Paver Support System
Schluter TROBA-LEVEL-PLV60/-PLA70Paver Support System
Schluter TROBA-LEVEL-LV3/-PL10Paver Support System
Schluter TROBA-LEVEL-LV3/-PL10Uncoupling (DITRA)
Schluter®-DITRA & DITRA-XLUncoupling (DITRA)
Schluter®-DITRA & DITRA-XLDITRA-HEAT-DUO, formerly DITRA-HEAT-TB, reduces sound transmission, in addition to warming the floor and still supporting the covering to ensure a lasting installation.
Can DITRA-HEAT-DUO-PS be repositioned after the membrane is first embedded to the substrate?
DITRA-HEAT-DUO-PS, depending on substrate and pressure used to initially embed membrane, can be repositioned if needed during installation...
Read moreWhy is megohmmeter testing strongly recommendedfor Schluter®-DITRA-HEAT-E-HK heating cables?
The insulation resistance test is intended to detect very small breaks throughout the cable insulation before, during, and after installation...
Read moreI ran out of room for my heating cables, can I cut them or put them under my cabinets?
NEVER cut or modify the heating cable in any way. This would change the cable resistance, will cause damage to the cable, and could cause cable overheating...
Read more