Peel & Stick DITRA-HEAT Membranes
Schluter®-DITRA-HEAT-PS and DITRA-HEAT-DUO-PS are peel and stick membranes, so are simple to use and take a fraction of the time to install.
Waterproofing (KERDI)
Schluter®-KERDIWaterproofing (KERDI)
Schluter®-KERDIPrefabricated Substrates
Schluter®-KERDI-SHOWER-T/-TS/-TTPrefabricated Substrates
Schluter®-KERDI-SHOWER-T/-TS/-TTPrefabricated Substrates
Schluter®-KERDI-SHOWER-LT/-LTSPrefabricated Substrates
Schluter®-KERDI-SHOWER-LT/-LTSShower & Tub Kits
Schluter®-KERDI-SHOWER-KIT-FLGShower & Tub Kits
Schluter®-KERDI-SHOWER-KIT-FLGAccessories / Niches
Schluter®-DESIGN-NICHEAccessories / Niches
Schluter®-DESIGN-NICHEKERDI-BOARD Panels
Schluter®-KERDI-BOARD-SNKERDI-BOARD Panels
Schluter®-KERDI-BOARD-SNKERDI-BOARD Panels
Schluter®-KERDI-BOARD-SBKERDI-BOARD Panels
Schluter®-KERDI-BOARD-SBShower & Tub Kits
Schluter®-KERDI-SHOWER-KITShower & Tub Kits
Schluter®-KERDI-SHOWER-KITShower & Tub Kits
Schluter®-KERDI-SHOWER-KIT-FLShower & Tub Kits
Schluter®-KERDI-SHOWER-KIT-FLDrains / Shower Drains
Schluter®-KERDI-DRAIN-HDrains / Shower Drains
Schluter®-KERDI-DRAIN-HAccessories
Schluter®-KERDI-BOARD-ZSDAccessories
Schluter®-KERDI-BOARD-ZSDLED Shower Niches
Schluter®-KERDI-BOARD-SNLTLED Shower Niches
Schluter®-KERDI-BOARD-SNLTSchluter®-DITRA-HEAT-PS and DITRA-HEAT-DUO-PS are peel and stick membranes, so are simple to use and take a fraction of the time to install.
We are very progressive about training and education, to the point that we have created our own apprenticeship program for our installers
Schluter®-KERDI waterproofing membrane, along with drain adaptor kits were installed in over 1,200 showers at the The Choctaw Casino and Resort.
Looking down on a great use of space. A well-planned space makes room for style using prefabricated tray substrates.
Is primer required for my peel & stick installation?
While not required, we strongly recommend application of PRIMER-PS to maximize adhesion of your P&S membrane onto...
Read moreWhat is the shelf life of Schluter thin-set mortars?
The shelf life of SET and ALL-SET is two years, while the shelf life for FAST-SET is one year.
Read moreAre the components of the LIPROTEC system replaceable?
Yes. The LED can easily be replaced by removing it from the mounting profile. NEC/CEC requires the drivers to be accessible, so they can also be...
Read more