Education for Architects and Designers
Find out more about AIA and IDCEC continuing education seminars available.
Waterproofing (KERDI)
Schluter®-KERDIWaterproofing (KERDI)
Schluter®-KERDIPrefabricated Substrates
Schluter®-KERDI-SHOWER-T/-TS/-TTPrefabricated Substrates
Schluter®-KERDI-SHOWER-T/-TS/-TTPrefabricated Substrates
Schluter®-KERDI-SHOWER-LT/-LTSPrefabricated Substrates
Schluter®-KERDI-SHOWER-LT/-LTSShower & Tub Kits
Schluter®-KERDI-SHOWER-KIT-FLGShower & Tub Kits
Schluter®-KERDI-SHOWER-KIT-FLGAccessories / Niches
Schluter®-DESIGN-NICHEAccessories / Niches
Schluter®-DESIGN-NICHEKERDI-BOARD Panels
Schluter®-KERDI-BOARD-SNKERDI-BOARD Panels
Schluter®-KERDI-BOARD-SNKERDI-BOARD Panels
Schluter®-KERDI-BOARD-SBKERDI-BOARD Panels
Schluter®-KERDI-BOARD-SBShower & Tub Kits
Schluter®-KERDI-SHOWER-KITShower & Tub Kits
Schluter®-KERDI-SHOWER-KITShower & Tub Kits
Schluter®-KERDI-SHOWER-KIT-FLShower & Tub Kits
Schluter®-KERDI-SHOWER-KIT-FLDrains / Shower Drains
Schluter®-KERDI-DRAIN-HDrains / Shower Drains
Schluter®-KERDI-DRAIN-HAccessories
Schluter®-KERDI-BOARD-ZSDAccessories
Schluter®-KERDI-BOARD-ZSDLED Shower Niches
Schluter®-KERDI-BOARD-SNLTLED Shower Niches
Schluter®-KERDI-BOARD-SNLTFind out more about AIA and IDCEC continuing education seminars available.
The Vesper project in Austin, Texas, utilized Schluter® Systems' DITRA-HEAT-DUO membrane for waterproofing and sound control in 283 condominium units. Collaboration with Schluter and STG-Austin expedited the project, ensuring quality results. Tests demonstrated exceptional resilience of Schluter products, surpassing building code standards with an AIIC value of 64. This project underscores the importance of efficiency and quality in multi-family construction.
QUADEC edging profile surrounds the KERDI-BOARD-SN shower niche, while the tile floor is kept cozy, warm with the DITRA-HEAT electric floor warming system.
KERDI-LINE-VARIO expands the length of the wall in this curbless shower.
What would happen to the LIPROTEC system in case of a power surge or brownout?
Both Schluter drivers have built-in protection against power fluctuations and will shut down in either of the situations listed above.
Read moreWhy are two floor temperature sensors provided with the Schluter®-DITRA-HEAT system?
Both floor temperature sensors are installed within the tile assembly. One sensor is connected to the thermostat, while...
Read moreHow long do I have to wait before installing tile on Schluter®-DITRA-HEAT?
Once the DITRA-HEAT membrane has been installed and the heating cables have been embedded within the membrane and tested, the tile can be installed right away...
Read more