Education for Architects and Designers
Find out more about AIA and IDCEC continuing education seminars available.
Termostatos
Schluter®-DITRA-HEAT-E-RS1
Schluter®-DITRA-HEAT-E-RS1
Termostatos
Schluter®-DITRA-HEAT-E-RS1Cables
Schluter®-DITRA-HEAT-E-HK-RK
Schluter®-DITRA-HEAT-E-HK-RK
Cables
Schluter®-DITRA-HEAT-E-HK-RKCables
Schluter®-DITRA-HEAT-E-HK-SK
Schluter®-DITRA-HEAT-E-HK-SK
Cables
Schluter®-DITRA-HEAT-E-HK-SKTermostatos
Schluter®-DITRA-HEAT-E-RRS
Schluter®-DITRA-HEAT-E-RRS
Termostatos
Schluter®-DITRA-HEAT-E-RRSTermostatos
Schluter®-DITRA-HEAT-E-RR
Schluter®-DITRA-HEAT-E-RR
Termostatos
Schluter®-DITRA-HEAT-E-RRCables
Schluter®-DITRA-HEAT-E-HK
Schluter®-DITRA-HEAT-E-HK
Cables
Schluter®-DITRA-HEAT-E-HKDesacoplamiento (DITRA)
Schluter®-DITRA-HEAT
Schluter®-DITRA-HEAT
Desacoplamiento (DITRA)
Schluter®-DITRA-HEATDesacoplamiento (DITRA)
Schluter®-DITRA-HEAT-DUO
Schluter®-DITRA-HEAT-DUO
Desacoplamiento (DITRA)
Schluter®-DITRA-HEAT-DUODesacoplamiento (DITRA)
Schluter®-DITRA-HEAT-DUO-PS
Schluter®-DITRA-HEAT-DUO-PS
Desacoplamiento (DITRA)
Schluter®-DITRA-HEAT-DUO-PSDesacoplamiento (DITRA)
Schluter®-DITRA-HEAT-PS
Schluter®-DITRA-HEAT-PS
Desacoplamiento (DITRA)
Schluter®-DITRA-HEAT-PSTermostatos
Schluter®-DITRA-HEAT-E-R
Schluter®-DITRA-HEAT-E-R
Termostatos
Schluter®-DITRA-HEAT-E-RTermostatos
Schluter®-DITRA-HEAT-E-RT
Schluter®-DITRA-HEAT-E-RT
Termostatos
Schluter®-DITRA-HEAT-E-RTFind out more about AIA and IDCEC continuing education seminars available.
Baseboards are one of the finishing touches that help to complete any space. Choosing a baseboard that is attractive, durable and easy to install is particularly important in commercial settings.
Peel and stick (PS) uncoupling membranes have hit the market and are gaining popularity. This is the new mess-free way to install an uncoupling membrane under tile, since there is no thin-set mortar required to install these membranes to plywood, OSB, gypsum, or concrete substrates – no mess, no stress.
Do I need to register for warranty coverage?
Can mosaic tile be used with Schluter®-DITRA-HEAT?
The minimum required tile format for use with DITRA-HEAT is 2" x 2" (50 mm x 50 mm). Please call Schluter®-Systems...
Read moreHow long do I have to wait after the installing Schluter®-DITRA-HEAT to start using the system?
Schluter®-Systems recommends waiting 7 days after grouting before consistent use of the DITRA-HEAT system...
Read more