Sound Control
Sound Control in Multi-family Dwellings. In multi-family dwellings such as condos, apartments, and hotels, sound control is paramount to quality of life.
Cables
Schluter®-DITRA-HEAT-E-HKCables
Schluter®-DITRA-HEAT-E-HKMovement Joint Profiles / Surface & Expansion Joints
Schluter®-DILEX-EKSBMovement Joint Profiles / Surface & Expansion Joints
Schluter®-DILEX-EKSBProfiles for LVT / LVT Applications on Floors
Schluter®-VINPRO-TProfiles for LVT / LVT Applications on Floors
Schluter®-VINPRO-TCove-shaped Profiles
Schluter®-DILEX-HKSCove-shaped Profiles
Schluter®-DILEX-HKSProfiles for LVT / LVT Applications on Floors
Schluter®-VINPRO-UProfiles for LVT / LVT Applications on Floors
Schluter®-VINPRO-UMovement Joint Profiles / Inside Corner Movement Joints
Schluter®-DILEX-BTOMovement Joint Profiles / Inside Corner Movement Joints
Schluter®-DILEX-BTOCove-shaped Profiles
Schluter®-DILEX-EKECove-shaped Profiles
Schluter®-DILEX-EKECove-shaped Profiles
Schluter®-DILEX-AHKCove-shaped Profiles
Schluter®-DILEX-AHKCove-shaped Profiles
Schluter®-DILEX-EHKCove-shaped Profiles
Schluter®-DILEX-EHKCove-shaped Profiles
Schluter®-DILEX-PHKCove-shaped Profiles
Schluter®-DILEX-PHKCove-shaped Profiles
Schluter®-DILEX-HKWCove-shaped Profiles
Schluter®-DILEX-HKWCove-shaped Profiles
Schluter®-DILEX-HKCove-shaped Profiles
Schluter®-DILEX-HKSound Control in Multi-family Dwellings. In multi-family dwellings such as condos, apartments, and hotels, sound control is paramount to quality of life.
Relocating a drain for a shower can be extremely challenging and potentially expensive in many remodeling and renovation situations.
Contractor Profile - Waldron Tile & Stone
Schluter-Systems is changing the way tiled bathrooms are built. In attendance at various conferences, Schluter-Systems will be presenting the Next Generation Bathroom, focusing on new materials and construction methods that combine moisture management, accessibility, and design.
What is the minimum stud spacing when installing the Schluter®-DITRA-HEAT-E-HK heating cables?
A cable spacing of 3 studs between runs is standard. However, cable may also be spaced at continuously alternating 3 stud – 2 stud intervals in isolated...
Read moreI plan to install an electric floor warming system on slab on grade. Are there any available Schluter products that can act as a thermal break?
Can DITRA-HEAT-PS be repositioned after the membrane is first embedded to the substrate?
DITRA-HEAT-PS, depending on substrate and pressure used to initially embed membrane, can be repositioned if needed during installation...
Read more