Cables
Schluter®-DITRA-HEAT-E-HKCables
Schluter®-DITRA-HEAT-E-HKMovement Joint Profiles / Surface & Expansion Joints
Schluter®-DILEX-EKSBMovement Joint Profiles / Surface & Expansion Joints
Schluter®-DILEX-EKSBProfiles for LVT / LVT Applications on Floors
Schluter®-VINPRO-TProfiles for LVT / LVT Applications on Floors
Schluter®-VINPRO-TCove-shaped Profiles
Schluter®-DILEX-HKSCove-shaped Profiles
Schluter®-DILEX-HKSProfiles for LVT / LVT Applications on Floors
Schluter®-VINPRO-UProfiles for LVT / LVT Applications on Floors
Schluter®-VINPRO-UMovement Joint Profiles / Inside Corner Movement Joints
Schluter®-DILEX-BTOMovement Joint Profiles / Inside Corner Movement Joints
Schluter®-DILEX-BTOCove-shaped Profiles
Schluter®-DILEX-EKECove-shaped Profiles
Schluter®-DILEX-EKECove-shaped Profiles
Schluter®-DILEX-AHKCove-shaped Profiles
Schluter®-DILEX-AHKCove-shaped Profiles
Schluter®-DILEX-EHKCove-shaped Profiles
Schluter®-DILEX-EHKCove-shaped Profiles
Schluter®-DILEX-PHKCove-shaped Profiles
Schluter®-DILEX-PHKCove-shaped Profiles
Schluter®-DILEX-HKWCove-shaped Profiles
Schluter®-DILEX-HKWCove-shaped Profiles
Schluter®-DILEX-HKCove-shaped Profiles
Schluter®-DILEX-HKSchluter provides optimal comfort at the Dallas-Fort Worth distribution center with the DITRA-HEAT-DUO electric floor heating system, creating a warm and inviting environment in this massive over 500,000 square feet installation
Tile installers, like any professional contractors, want to do their jobs faster without compromising their quality standards or driving up their material costs. To help installers achieve this goal, Schluter Systems is providing its Kerdi waterproof membrane in a roll twice as wide as the previous roll.
The Eiffel Tower - Ferrié Pavilion's renovation involved installing natural stone floors amidst heavy tourist traffic. EDM Paris utilized Schluter®-DITRA to mitigate vibrations, ensuring durability and stability.
What is the minimum stud spacing when installing the Schluter®-DITRA-HEAT-E-HK heating cables?
A cable spacing of 3 studs between runs is standard. However, cable may also be spaced at continuously alternating 3 stud – 2 stud intervals in isolated...
Read moreI plan to install an electric floor warming system on slab on grade. Are there any available Schluter products that can act as a thermal break?
Can DITRA-HEAT-PS be repositioned after the membrane is first embedded to the substrate?
DITRA-HEAT-PS, depending on substrate and pressure used to initially embed membrane, can be repositioned if needed during installation...
Read more