Search Results for

Waterproofing

Schluter®-KERDI-KERECK-F/-KERS-B
Schluter®-KERDI-KERECK-F/-KERS-B Schluter®-KERDI-KERECK-F/-KERS-B

Waterproofing

Schluter®-KERDI-KERECK-F/-KERS-B
Schluter®-KERDI-KERECK and KERDI-KERS-B are preformed, seamless corners made for waterproofing inside and outside corners of KERDI, KERDI-BOARD, and DITRA assemblies to prevent leaks and mold-growth.
View Product Details

Shower & Tub Kits

Schluter®-KERDI-SHOWER-KIT-FL
Schluter®-KERDI-SHOWER-KIT-FL Schluter®-KERDI-SHOWER-KIT-FL

Shower & Tub Kits

Schluter®-KERDI-SHOWER-KIT-FL
This kit contains all the elements of the complete Schluter®-KERDI-SHOWER-KIT except the drain grate.
View Product Details
Schluter®-KERDI-SHOWER-KIT-FLG Schluter®-KERDI-SHOWER-KIT-FLG

Shower & Tub Kits

Schluter®-KERDI-SHOWER-KIT-FLG
The Schluter®-KERDI-SHOWER-KIT is an all-inclusive package containing each of the components required to create a watertight shower assembly.
View Product Details

Prefabricated Substrates

Schluter®-KERDI-SHOWER-T/-TS/-TT
Schluter®-KERDI-SHOWER-T/-TS/-TT Schluter®-KERDI-SHOWER-T/-TS/-TT

Prefabricated Substrates

Schluter®-KERDI-SHOWER-T/-TS/-TT
Schluter®-KERDI-SHOWER-T/-TS/-TT are prefabricated sloped shower trays with integrated KERDI waterproofing that eliminate the need for a mortar bed.
View Product Details
Schluter's Product Solutions at Hotel Drover in Fort Worth

Schluter®-Systems enhanced the performance and style of Hotel Drover in Fort Worth’s historic Stockyards. The renovation preserved the area's rich history while providing modern luxury. Schluter's waterproofing solutions played a crucial role in blending Texas heritage with comfort in this boutique hotel, part of Marriott's Autograph Collection.

Sustainable Corporate Construction at Schluter-Systems Reno

To accommodate the growing needs of our western customers, we constructed a state-of-the-art, 172,500 sq. ft. facility in McCarran, Nevada, just east of Reno. The facility includes a two-story, 22,500 sq. ft. office space and training center, along with a 150,000 sq. ft. warehouse and distribution center.

Eco-Conscious Construction at Schluter-Systems Canada HQ

Built to meet the growing needs of our Canadian headquarters, this 66,000 ft2 facility includes three floors of offices, a large training center, a multimedia studio and a sample preparation department. Our building showcases the compatibility of ceramic tile with green building practices.

Schluter Workshops for Tile and Building Industry Professionals

Explore Schluter's education and training for tile installers and professionals in the construction and building industries. Learn advanced installation techniques, product innovations, and best practices.

  • 1(current)
  • 2
  • 3
Q:

How soon can I grout when using FAST-SET®.

A:

4 hours.

Read more
Q:

What size notched trowel should I use to install Schluter-DITRA and Schluter®-DITRA-XL?

A:

For DITRA use a 1/4" x 3/16" (6 mm x 5 mm) V-notched trowel, 5/16" x 5/16"...

Read more
Q:

What is the earliest that the thermostat will begin heating?

A:

4 hours. Yes, the Adaptive Funtion will reset with a Factory Reset.

Read more
  • 1(current)
  • 2
  • 3

Product Table 1  Results

Profiles_Walls.pdf
0.52 MB
PDF

Warranties 1  Results

Schluter-Systems Wall and Countertop Profiles 5-Year Limited Warranty.pdf
0.27 MB
PDF

Data sheets 1  Results

Wall and Countertop Profiles Data Sheet.pdf
6.07 MB
PDF
  • 1(current)
  • 2
  • 3
02:23

Schluter®Countertop System Installation Segment 4: Faucet Installation/Grout

14:33

How to install tile edge trim on stairs: Schluter®-TREP-S/-SE/-B/-TAP profiles

12:45

Comment poser les panneaux étanches Schluter®-KERDI-BOARD sur les contours d'une baignoire.

12:44

Schluter®-KERDI-BOARD over Framing in Bathtub Surround Applications

  • 1(current)
  • 2
  • 3