Schluter®-DITRA in Eiffel Tower
The Eiffel Tower - Ferrié Pavilion's renovation involved installing natural stone floors amidst heavy tourist traffic. EDM Paris utilized Schluter®-DITRA to mitigate vibrations, ensuring durability and stability.
Uncoupling (DITRA)
Schluter®-DITRA & DITRA-XLUncoupling (DITRA)
Schluter®-DITRA & DITRA-XLThermostats
Schluter®-DITRA-HEAT-E-RS1Thermostats
Schluter®-DITRA-HEAT-E-RS1Thermostats
Schluter®-DITRA-HEAT-E-RTThermostats
Schluter®-DITRA-HEAT-E-RTThermostats
Schluter®-DITRA-HEAT-E-RThermostats
Schluter®-DITRA-HEAT-E-RThermostats
Schluter®-DITRA-HEAT-E-RRSThermostats
Schluter®-DITRA-HEAT-E-RRSCables
Schluter®-DITRA-HEAT-E-HK-RKCables
Schluter®-DITRA-HEAT-E-HK-RKCables
Schluter®-DITRA-HEAT-E-HK-SKCables
Schluter®-DITRA-HEAT-E-HK-SKThermostats
Schluter®-DITRA-HEAT-E-WiFiThermostats
Schluter®-DITRA-HEAT-E-WiFiCables
Schluter®-DITRA-HEAT-E-HKCables
Schluter®-DITRA-HEAT-E-HKThermostats
Schluter®-DITRA-HEAT-E-RRThermostats
Schluter®-DITRA-HEAT-E-RRUncoupling (DITRA)
Schluter®-DITRA-HEATUncoupling (DITRA)
Schluter®-DITRA-HEATThe Eiffel Tower - Ferrié Pavilion's renovation involved installing natural stone floors amidst heavy tourist traffic. EDM Paris utilized Schluter®-DITRA to mitigate vibrations, ensuring durability and stability.
By using a dedicated heating cable and ensuring the shower area has completed required waterproofing steps the shower floor can be warmed, just like any other tiled floor.
DlTRA uncoupling membrane for tiled floors in a peel and stick option, DITRA-PS. Optimize the bond by using PRIMER-PS.
Schluter Systems has expanded its offering of drains to include the Schluter®-KERDI-DRAIN-F.
How long do I have to wait after the installing Schluter®-DITRA-HEAT to start using the system?
Schluter®-Systems recommends waiting 7 days after grouting before consistent use of the DITRA-HEAT system...
Read moreHow long do I have to wait before installing tile on Schluter®-DITRA-HEAT?
Once the DITRA-HEAT membrane has been installed and the heating cables have been embedded within the membrane and tested, the tile can be installed right away...
Read moreCan DITRA-HEAT-PS be repositioned after the membrane is first embedded to the substrate?
DITRA-HEAT-PS, depending on substrate and pressure used to initially embed membrane, can be repositioned if needed during installation...
Read more