DITRA-PS and PRIMER-PS Peel and Stick
DlTRA uncoupling membrane for tiled floors in a peel and stick option, DITRA-PS. Optimize the bond by using PRIMER-PS.
Uncoupling (DITRA)
Schluter®-DITRA & DITRA-XL
Schluter®-DITRA & DITRA-XL
Uncoupling (DITRA)
Schluter®-DITRA & DITRA-XLUncoupling (DITRA)
Schluter®-DITRA-PS
Schluter®-DITRA-PS
Uncoupling (DITRA)
Schluter®-DITRA-PSUncoupling (DITRA)
Schluter®-DITRA-HEAT
Schluter®-DITRA-HEAT
Uncoupling (DITRA)
Schluter®-DITRA-HEAT
Schluter®-DITRA Roller
Schluter®-DITRA Roller
Thermostats
Schluter®-DITRA-HEAT-E-RS1
Schluter®-DITRA-HEAT-E-RS1
Thermostats
Schluter®-DITRA-HEAT-E-RS1Thermostats
Schluter®-DITRA-HEAT-E-RT
Schluter®-DITRA-HEAT-E-RT
Thermostats
Schluter®-DITRA-HEAT-E-RTThermostats
Schluter®-DITRA-HEAT-E-R
Schluter®-DITRA-HEAT-E-R
Thermostats
Schluter®-DITRA-HEAT-E-RThermostats
Schluter®-DITRA-HEAT-E-WiFi
Schluter®-DITRA-HEAT-E-WiFi
Thermostats
Schluter®-DITRA-HEAT-E-WiFiThermostats
Schluter®-DITRA-HEAT-E-RRS
Schluter®-DITRA-HEAT-E-RRS
Thermostats
Schluter®-DITRA-HEAT-E-RRSCables
Schluter®-DITRA-HEAT-E-HK
Schluter®-DITRA-HEAT-E-HK
Cables
Schluter®-DITRA-HEAT-E-HKThermostats
Schluter®-DITRA-HEAT-E-RR
Schluter®-DITRA-HEAT-E-RR
Thermostats
Schluter®-DITRA-HEAT-E-RRUncoupling (DITRA)
Schluter®-DITRA-HEAT-DUO
Schluter®-DITRA-HEAT-DUO
Uncoupling (DITRA)
Schluter®-DITRA-HEAT-DUODlTRA uncoupling membrane for tiled floors in a peel and stick option, DITRA-PS. Optimize the bond by using PRIMER-PS.
The Eiffel Tower - Ferrié Pavilion's renovation involved installing natural stone floors amidst heavy tourist traffic. EDM Paris utilized Schluter®-DITRA to mitigate vibrations, ensuring durability and stability.
Schluter Systems has expanded its offering of drains to include the Schluter®-KERDI-DRAIN-F.
To continue the company’s commitment to industry education, Schluter has developed a series of live, online training programs that can be attended remotely.
Can DITRA-HEAT-PS be repositioned after the membrane is first embedded to the substrate?
DITRA-HEAT-PS, depending on substrate and pressure used to initially embed membrane, can be repositioned if needed during installation...
Read moreCan DITRA-HEAT-DUO-PS be repositioned after the membrane is first embedded to the substrate?
DITRA-HEAT-DUO-PS, depending on substrate and pressure used to initially embed membrane, can be repositioned if needed during installation...
Read moreI plan to install an electric floor warming system on slab on grade. Are there any available Schluter products that can act as a thermal break?