DITRA-PS and PRIMER-PS Peel and Stick
DlTRA uncoupling membrane for tiled floors in a peel and stick option, DITRA-PS. Optimize the bond by using PRIMER-PS.
Uncoupling (DITRA)
Schluter®-DITRA & DITRA-XL
Schluter®-DITRA & DITRA-XL
Uncoupling (DITRA)
Schluter®-DITRA & DITRA-XLUncoupling (DITRA)
Schluter®-DITRA-PS
Schluter®-DITRA-PS
Uncoupling (DITRA)
Schluter®-DITRA-PSUncoupling (DITRA)
Schluter®-DITRA-HEAT
Schluter®-DITRA-HEAT
Uncoupling (DITRA)
Schluter®-DITRA-HEAT
Schluter®-DITRA Roller
Schluter®-DITRA Roller
Thermostats
Schluter®-DITRA-HEAT-E-RS1
Schluter®-DITRA-HEAT-E-RS1
Thermostats
Schluter®-DITRA-HEAT-E-RS1Thermostats
Schluter®-DITRA-HEAT-E-RT
Schluter®-DITRA-HEAT-E-RT
Thermostats
Schluter®-DITRA-HEAT-E-RTThermostats
Schluter®-DITRA-HEAT-E-R
Schluter®-DITRA-HEAT-E-R
Thermostats
Schluter®-DITRA-HEAT-E-RThermostats
Schluter®-DITRA-HEAT-E-WiFi
Schluter®-DITRA-HEAT-E-WiFi
Thermostats
Schluter®-DITRA-HEAT-E-WiFiThermostats
Schluter®-DITRA-HEAT-E-RRS
Schluter®-DITRA-HEAT-E-RRS
Thermostats
Schluter®-DITRA-HEAT-E-RRSCables
Schluter®-DITRA-HEAT-E-HK
Schluter®-DITRA-HEAT-E-HK
Cables
Schluter®-DITRA-HEAT-E-HKThermostats
Schluter®-DITRA-HEAT-E-RR
Schluter®-DITRA-HEAT-E-RR
Thermostats
Schluter®-DITRA-HEAT-E-RRUncoupling (DITRA)
Schluter®-DITRA-HEAT-DUO
Schluter®-DITRA-HEAT-DUO
Uncoupling (DITRA)
Schluter®-DITRA-HEAT-DUODlTRA uncoupling membrane for tiled floors in a peel and stick option, DITRA-PS. Optimize the bond by using PRIMER-PS.
The Eiffel Tower - Ferrié Pavilion's renovation involved installing natural stone floors amidst heavy tourist traffic. EDM Paris utilized Schluter®-DITRA to mitigate vibrations, ensuring durability and stability.
Schluter Systems has expanded its offering of drains to include the Schluter®-KERDI-DRAIN-F.
To continue the company’s commitment to industry education, Schluter has developed a series of live, online training programs that can be attended remotely.
What Primer should I use?
We strongly recommend PRIMER-PS as it is the purpose-built primer to work with DITRA-PS, DITRA-HEAT-PS, and...
Read moreWhat is the minimum stud spacing when installing the Schluter®-DITRA-HEAT-E-HK heating cables?
A cable spacing of 3 studs between runs is standard. However, cable may also be spaced at continuously alternating 3 stud – 2 stud intervals in isolated...
Read moreIf I use a self-leveler on my plywood subfloor, which type of thin-set mortar do I used to install Schluter®-DITRA or DITRA-XL?
We recommend Schluter SET™ , ALL-SET™ , FAST-SET™, or unmodified thin-set mortar on a floor that has been leveled with a self-leveling product.
Read more