Uncoupling (DITRA)
Schluter®-DITRA & DITRA-XL
Schluter®-DITRA & DITRA-XL
Uncoupling (DITRA)
Schluter®-DITRA & DITRA-XLCables
Schluter®-DITRA-HEAT-E-HK
Schluter®-DITRA-HEAT-E-HK
Cables
Schluter®-DITRA-HEAT-E-HKUncoupling (DITRA)
Schluter®-DITRA-HEAT
Schluter®-DITRA-HEAT
Uncoupling (DITRA)
Schluter®-DITRA-HEAT
Schluter®-TROWEL
Schluter®-TROWEL
Waterproofing
Schluter®-KERDI-SEAL-PS/-MV
Schluter®-KERDI-SEAL-PS/-MV
Waterproofing
Schluter®-KERDI-SEAL-PS/-MVDrains / Shower Drains
Schluter®-KERDI-DRAIN
Schluter®-KERDI-DRAIN
Drains / Shower Drains
Schluter®-KERDI-DRAINUncoupling (DITRA)
Schluter®-DITRA-HEAT-DUO
Schluter®-DITRA-HEAT-DUO
Uncoupling (DITRA)
Schluter®-DITRA-HEAT-DUODrains / Floor Drains
Schluter®-KERDI-DRAIN-F
Schluter®-KERDI-DRAIN-F
Drains / Floor Drains
Schluter®-KERDI-DRAIN-FUncoupling (DITRA)
Schluter®-DITRA-HEAT-PS
Schluter®-DITRA-HEAT-PS
Uncoupling (DITRA)
Schluter®-DITRA-HEAT-PSUncoupling (DITRA)
Schluter®-DITRA-HEAT-DUO-PS
Schluter®-DITRA-HEAT-DUO-PS
Uncoupling (DITRA)
Schluter®-DITRA-HEAT-DUO-PSDrains / Shower Drains
Schluter®-KERDI-LINE
Schluter®-KERDI-LINE
Drains / Shower Drains
Schluter®-KERDI-LINEUncoupling (DITRA)
Schluter®-DITRA-PS
Schluter®-DITRA-PS
Uncoupling (DITRA)
Schluter®-DITRA-PSNow, with the advancement of peel and stick technology, uncoupling membranes have become even more convenient and easier to install. Whether you’re working on a time-sensitive project or need a solution for multi-story buildings where weight and speed are critical factors, peel and stick membranes provide a faster, lighter alternative.
See how DITRA and ALL-SET® supported the precise restoration of a heritage tile floor—preserving design integrity at the historic Québec Seminary Chapel.
The Vesper project in Austin, Texas, utilized Schluter® Systems' DITRA-HEAT-DUO membrane for waterproofing and sound control in 283 condominium units. Collaboration with Schluter and STG-Austin expedited the project, ensuring quality results. Tests demonstrated exceptional resilience of Schluter products, surpassing building code standards with an AIIC value of 64. This project underscores the importance of efficiency and quality in multi-family construction.
What is the minimum stud spacing when installing the Schluter®-DITRA-HEAT-E-HK heating cables?
A cable spacing of 3 studs between runs is standard. However, cable may also be spaced at continuously alternating 3 stud – 2 stud intervals in isolated...
Read moreCan I use Regulator Mode with my Control4 system?
No, Regulator Mode is not supported by Control4. If you require the use of Regulator Mode, please contact...
Read moreHow much thin-set do I need to install tile over DITRA or DITRA-HEAT?
After determining correct trowel notch size, based on tile type and size, refer to the mortar coverage chart...
Read more