Tile Installation on Problematic Substrates
Presented at Qualicer, Castellon, Spain, William M. Carty, Ph.D. and Peter A. Nielsen,
Cables
Schluter®-DITRA-HEAT-E-HKCables
Schluter®-DITRA-HEAT-E-HKMovement Joint Profiles / Surface & Expansion Joints
Schluter®-DILEX-EKSBMovement Joint Profiles / Surface & Expansion Joints
Schluter®-DILEX-EKSBProfiles for LVT / LVT Applications on Floors
Schluter®-VINPRO-TProfiles for LVT / LVT Applications on Floors
Schluter®-VINPRO-TCove-shaped Profiles
Schluter®-DILEX-HKSCove-shaped Profiles
Schluter®-DILEX-HKSProfiles for LVT / LVT Applications on Floors
Schluter®-VINPRO-UProfiles for LVT / LVT Applications on Floors
Schluter®-VINPRO-UMovement Joint Profiles / Inside Corner Movement Joints
Schluter®-DILEX-BTOMovement Joint Profiles / Inside Corner Movement Joints
Schluter®-DILEX-BTOCove-shaped Profiles
Schluter®-DILEX-EKECove-shaped Profiles
Schluter®-DILEX-EKECove-shaped Profiles
Schluter®-DILEX-AHKCove-shaped Profiles
Schluter®-DILEX-AHKCove-shaped Profiles
Schluter®-DILEX-EHKCove-shaped Profiles
Schluter®-DILEX-EHKCove-shaped Profiles
Schluter®-DILEX-PHKCove-shaped Profiles
Schluter®-DILEX-PHKCove-shaped Profiles
Schluter®-DILEX-HKWCove-shaped Profiles
Schluter®-DILEX-HKWCove-shaped Profiles
Schluter®-DILEX-HKCove-shaped Profiles
Schluter®-DILEX-HKPresented at Qualicer, Castellon, Spain, William M. Carty, Ph.D. and Peter A. Nielsen,
Schluter®-Systems has launched a completely new website that simplifies navigation and provides several interactive tools that make it much easier to design and specify tile projects.
Sean Gerolimatos
The Linden, a luxury condominium tower in Austin, Texas, required high-quality materials for its 117 residences. Schluter® Systems provided full-service solutions for the showers, ensuring compatibility and simplifying support processes. Bartlett Cocke General Contractors, with their experience, appreciated Schluter's innovative approach and comprehensive warranty. Collaboration between Rhode Partners, Bartlett Cocke, Precision Flooring, and Schluter exceeded expectations, bringing the architect's vision to life. The success of The Linden project highlights the importance of collaboration, innovation, and quality assurance in high-end construction.
What is the minimum stud spacing when installing the Schluter®-DITRA-HEAT-E-HK heating cables?
A cable spacing of 3 studs between runs is standard. However, cable may also be spaced at continuously alternating 3 stud – 2 stud intervals in isolated...
Read moreI plan to install an electric floor warming system on slab on grade. Are there any available Schluter products that can act as a thermal break?
Can DITRA-HEAT-PS be repositioned after the membrane is first embedded to the substrate?
DITRA-HEAT-PS, depending on substrate and pressure used to initially embed membrane, can be repositioned if needed during installation...
Read more