Cables
Schluter®-DITRA-HEAT-E-HK
Schluter®-DITRA-HEAT-E-HK
Cables
Schluter®-DITRA-HEAT-E-HKUncoupling (DITRA)
Schluter®-DITRA-HEAT
Schluter®-DITRA-HEAT
Uncoupling (DITRA)
Schluter®-DITRA-HEATDrains / Floor Drains
Schluter®-KERDI-DRAIN-F
Schluter®-KERDI-DRAIN-F
Drains / Floor Drains
Schluter®-KERDI-DRAIN-FUncoupling (DITRA)
Schluter®-DITRA-HEAT-PS
Schluter®-DITRA-HEAT-PS
Uncoupling (DITRA)
Schluter®-DITRA-HEAT-PSCables
Schluter®-DITRA-HEAT-E-HK-RK
Schluter®-DITRA-HEAT-E-HK-RK
Cables
Schluter®-DITRA-HEAT-E-HK-RKCables
Schluter®-DITRA-HEAT-E-HK-SK
Schluter®-DITRA-HEAT-E-HK-SK
Cables
Schluter®-DITRA-HEAT-E-HK-SKThermostats
Schluter®-DITRA-HEAT-E-RS1
Schluter®-DITRA-HEAT-E-RS1
Thermostats
Schluter®-DITRA-HEAT-E-RS1Thermostats
Schluter®-DITRA-HEAT-E-RT
Schluter®-DITRA-HEAT-E-RT
Thermostats
Schluter®-DITRA-HEAT-E-RTThermostats
Schluter®-DITRA-HEAT-E-R
Schluter®-DITRA-HEAT-E-R
Thermostats
Schluter®-DITRA-HEAT-E-RThermostats
Schluter®-DITRA-HEAT-E-WiFi
Schluter®-DITRA-HEAT-E-WiFi
Thermostats
Schluter®-DITRA-HEAT-E-WiFiThermostats
Schluter®-DITRA-HEAT-E-RR
Schluter®-DITRA-HEAT-E-RR
Thermostats
Schluter®-DITRA-HEAT-E-RR
Schluter®-BEKOTEC-THERM-RH 75
Schluter®-BEKOTEC-THERM-RH 75
Built to meet the growing needs of our Canadian headquarters, this 66,000 ft2 facility includes three floors of offices, a large training center, a multimedia studio and a sample preparation department. Our building showcases the compatibility of ceramic tile with green building practices.
A bathroom renovation is more than just aesthetics; it's an investment in comfort, functionality, and safety. One of the most critical aspects of bathroom remodeling is mold and moisture control. Read on to learn more.
The Linden, a luxury condominium tower in Austin, Texas, required high-quality materials for its 117 residences. Schluter® Systems provided full-service solutions for the showers, ensuring compatibility and simplifying support processes. Bartlett Cocke General Contractors, with their experience, appreciated Schluter's innovative approach and comprehensive warranty. Collaboration between Rhode Partners, Bartlett Cocke, Precision Flooring, and Schluter exceeded expectations, bringing the architect's vision to life. The success of The Linden project highlights the importance of collaboration, innovation, and quality assurance in high-end construction.
How long do I have to wait before installing tile on Schluter®-DITRA-HEAT?
Once the DITRA-HEAT membrane has been installed and the heating cables have been embedded within the membrane and tested, the tile can be installed right away...
Read moreI’m planning to install my tile using Schluter®-DITRA. Where do I begin?
The first thing to do is plan out the installation according to the Schluter-DITRA Installation Handbook...
Read moreThe under floor heating cable has a ground wire, however the thermostat has no terminal for ground. What shall I do with the ground wire?
The heating cable ground wire can be hooked up to house ground within the junction box.
Read more